Used Capacity on one of our VDP reached 96.46% and Backup Scheduler was stopped. I'm able to start Backup Scheduler. But although I deleted many backups the used capacity is still the same. Is any way to freeing up space or should I better do rollback to the last validated checkpoint?
↧